Projects: Demolition of the former dairy in Berka/Werra

Overall view of one building with the chimney at the right end

Location: Berka/Werra
Structure:
 former dairy
Project time frame:
September – November 2023

Since 2012 the former dairy in Werra-Suhl-Tal is getting dismantled as a part of urban development. Recently MB Spezialabbruch was commissioned to demolish the 4th construction section. In addition to the complete demolition and disposal of several building complexes, this also includes the dismantling of an approximately 42 metres high brick chimney. The prerequisite for the demolition of these buildings is their gutting and the removal of pollutants.